Information
Installed capacity | 60 |
---|---|
Generating capacity | 480 |
Carbon dioxide: (CO2) | 90-98 |
---|---|
Hydrogen sulphide: (H2S) | 2-10 |
Power station | VST hf., Rafteikning hf. |
---|---|
Steam gathering system | Manfreð Vilhjálmsson |
Transmission line to Akureyri and the East of Iceland designed and built by | RARIK ohf. |
Geothermal exploration and supervision of geothermal drilling works | Orkustofnun |
Turbines, generators and machinery | Mitsubishi Heavy Industries, Japan |
---|---|
Cooling towers | Marley, USA |
Transformers | EGB, Austria |
Low voltage power distribution | Alstom, France |
Civil Works and Buildings | Sniðill hf. |
---|---|
Drilling | Jarðboranir ríkisins |
Metal works and installation | Slippstöðin hf. |
Installation of turbine unit 2 and expansion of steam gathering system 1996-1998 | Verkfræðistofa Guðmundar og Kristjáns hf. |
---|---|
Engineering Design and supervision | Verkfræðistofa Guðmundar og Kristjáns hf. |
Drilling | Jarðboranir hf. |
---|---|
Mechanical equipment | Mitsubishi Heavy Industries, Alstom |
Electrical and control equipment | Lögstrup |
Installation of mechanical equipment and grounding | Vélsmiðjan Gils |
Installation of electric equipment | Ljósgjafinn |