Information

Power and energy
Installed capacity

60

MW
Generating capacity

480

GWh
Main gas types in the geothermal steam
Carbon dioxide: (CO2)

90-98

%
Hydrogen sulphide: (H2S)

2-10

%
Original design
Power station

VST hf., Rafteikning hf.
Rogers Engineering Co. Inc.
VST hf.
Virkir hf.

Steam gathering system

Manfreð Vilhjálmsson
Þorvaldur Þorvaldsson

Transmission line to Akureyri and the East of Iceland designed and built by

RARIK ohf.

Geothermal exploration and supervision of geothermal drilling works

Orkustofnun

Equipment manufacturers
Turbines, generators and machinery

Mitsubishi Heavy Industries, Japan

Cooling towers

Marley, USA

Transformers

EGB, Austria

Low voltage power distribution

Alstom, France

Main contractors 1975-1977
Civil Works and Buildings

Sniðill hf.
BSHSÞ
Miðfell hf.

Drilling

Jarðboranir ríkisins

Metal works and installation

Slippstöðin hf.
Héðinn / Stálsmiðjan / Hamar og Stjörnu-stál hf.
Rafafl hf.

Cabling
Installation of turbine unit 2 and expansion of steam gathering system 1996-1998

Verkfræðistofa Guðmundar og Kristjáns hf.
Rafteikning hf.

Engineering Design and supervision

Verkfræðistofa Guðmundar og Kristjáns hf.
Rafteikning hf.

Main contractors
Drilling

Jarðboranir hf.

Mechanical equipment

Mitsubishi Heavy Industries, Alstom

Electrical and control equipment

Lögstrup

Installation of mechanical equipment and grounding

Vélsmiðjan Gils
Vélsmiðjan Grímur
Sniðill

Installation of electric equipment

Ljósgjafinn
Rafeyri
Rafiðn og Öryggi