Information

Búrfell II Power Station
Rated head

121.5

m
Installed capacity

1 x 100

MW
Genereating capacity

2300

GWh/year
Discharge
Catchment area

6.750

km²
Average discharge

315

m³/s
Harnessed discharge

92

m³/s
Reservoir
Area of Bjarnalón

1.18

km²
Live storage

1.7

Gl
Highest RWL

247

m.y.s.
Lowest RWL

241

m.y.s.
Headrace canal
Length

370

m
Bottom level

232.5

m.y.s.
Vertical pressure tunnels
Diameter

5.2

m
Length

110

m
High voltage cable
Length

2.7

km
Voltage

245

kV
Powerhouse
Height

33

m
Length

65

m
Width

15.35

m
Tailrace tunnel
Length

450

m
Area

72

km²
Access tunnel
Length

270

m
Key data
Excavation

1

milljón m³
Concrete

26,000

ECO concrete

195

Main contractors
Construction Supervision

Landsvirkjun
Mannvit

Engineering design

Verkís

Architect

VA arkitektar

Landscape architect

Landark

Civil contractor

ÍAV Marti Búrfell

Electrical & Mechanical Contractor

Andritz Hydro, Germany

Gates and steel lining Contractor

DSD Noell, Germany

High voltage cable Manufacturer

LS Cable, South Korea

Main transformers Manufacturer

Efacec, Portugal